(Last Updated On: December 24, 2022)

Level-5 Co., Ltd. is actually presently corrupted in China relating to the future show timetable of the television animation “Megaton-class Musashi Season 2”, the most recent work of the cross-media venture. Due to the quick spreading of the brand-new coronavirus, there was a problem in the video clip production that was gotten from a local area business.
Additionally, in view of the condition where there is actually no prospect of merging for the time being actually, January 6 (Friday) to preserve the top quality of the principal tale) Our team have determined to delay the show of episode 24 as well as past. Our company genuinely apologize for the aggravation created to the audiences who are actually anticipating the show, and also to everyone included.
ASSOCIATED|Top 30+ Sword Fighting Anime Series: Epic Battles and also Skilled Swordplay
Down the road, component of the production work are going to be shifted to function in Japan to decrease the impact of the brand new coronavirus in China, and in addition to OLM, that is in charge of animation production, Level-5 is going to continue to take part in animation development.
Our team will make an effort to bounce back the schedule through joint manufacturing. Relating to the program timetable of the potential TV cartoons “Megaton Class Musashi Season 2”, in addition to the rebroadcast routine, the show routine approximately episode 28, which is the ultimate incident, will certainly be actually chosen as well as declared as observes.
Source: Anime News Network